Replacement of faulty cable with new cable from LT Panel near B Block to LT panel below staircase in L-Block including supplying, excavation, laying in ground, trench and on wall surface and end termination at Karampura Campus of Dr. B.R.Ambedkar Universi
- Open Date : 07-02-2023 12:55 PM
- Close Date : 01-03-2023 12:55 PM
Corrigendum Document :
- Corrigendum No.1 0.34 MB
- Corrigendum No.2 0.3 MB
डॉ. बी. आर. अम्बेडकर विश्वविद्यालय दिल्ली