Replacement of faulty cables with new cable from B Block LT Panel to B Barrack and from LT panel near staircase of L Block to distribution board near L Block water cooler including supplying, excavation, laying in ground and end termination at Karampura
- Open Date : 23-11-2021 12:55 PM
- Close Date : 16-02-2022 12:55 PM
Corrigendum Document :
- Corrigendum No. 1 0.21 MB
- Corrigendum No. 2 0.21 MB
- Corrigendum No. 3 0.22 MB
- Corrigendum No. 4 0.22 MB
डॉ. बी. आर. अम्बेडकर विश्वविद्यालय दिल्ली